Day 26 Aug 11 Bled the brakes with the power bleeder. Found I had a few loose fittings. But, once everything was tightened up – very fast and easy to use. Had to buy another quart of fluid after I forced out some with the leaks. (1 hr)
Day 27 Aug 13 Finished marking frame on floor pieces for drilling and riveting. Checked off the 14th box (2 hrs)
Day 28 Aug 14 Drilled all the floor pieces upper and lowers. (2 hrs)
Day 29 Aug 15 Page 197 Drilled and riveted 50+ to install the lower floor aluminum pieces – New air riveter is a must. One light squeeze and the rivet is in. Laid out all of the foam pieces only to find they don’t fit. Had to trim all 7 pieces. Not a big deal, but unnecessary (5 hrs)
Day 30 Aug 16 Page 200 With help from my granddaughter, finished the install on the floor foam and the top layer of aluminum 100+ rivets (2 hrs) Picked up the Engine Hoist for the motor install