Day 26-30

Updated: Aug 16

Day 26    Aug 11 Bled the brakes with the power bleeder. Found I had a few loose fittings. But, once everything was tightened up – very fast and easy to use. Had to buy another quart of fluid after I forced out some with the leaks.  (1 hr)


Day 27    Aug 13  Finished marking frame on floor pieces for drilling and riveting.     Checked off the 14th box (2 hrs)


Day 28    Aug 14  Drilled all the floor pieces upper and lowers. (2 hrs)


Day 29    Aug 15  Page 197  Drilled and riveted 50+ to install the lower floor aluminum pieces – New air riveter is a must. One light squeeze and the rivet is in.  Laid out all of the foam pieces only to find they don’t fit. Had to trim all 7 pieces. Not a big deal, but unnecessary (5 hrs) 


Day 30    Aug 16  Page 200  With help from my granddaughter, finished the install on the floor foam and the top layer of aluminum 100+ rivets (2 hrs) Picked up the Engine Hoist for the motor install